New Supply To Residential Development In Byron Bay

  • Client: Residential Development
  • Location: Byron Bay
  • Turbine Equipment: MFE 2.5 MW
  • Total Capacity: 15MW
  • Completed: 2016-02-24
  • Homes Powered: 300

This project required that we change an existing High Voltage Pole and install a new pole mounted substation. We also had to install some over head low voltage mains to feed the new units.

Although this work is classed as contestable work we are installing an Electrical Distribution network that is owned and operated by Essential Energy. The customer has to pay for these works so it’s imperative that the work is carried out:

  • Safely
  • Efficiently
  • On Time

This means that the customers costs is kept to a minimum.