Lennox Head Service Replacement

  • Client: Essential Energy
  • Location: Lennox Head
  • Turbine Equipment:
  • Total Capacity:
  • Completed: 2016-04-03
  • Homes Powered: 12

With the continued increase in loads through out seaside towns mixed with salt contamination it’s a continuos program to maintain and replace services. Working on the coast always brings plenty of challenges but one that our crews love to tackle.