Lennox Head Service Replacement

  • Client: Another Customer
  • Location: Malaysia
  • Turbine Equipment: GEF 1.85 MW
  • Total Capacity: 150 MW
  • Completed: 2016-04-03
  • Homes Powered: 15000

With the continued increase in loads through out seaside towns mixed with salt contamination it’s a continuos program to maintain and replace services. Working on the coast always brings plenty of challenges but one that our crews love to tackle.